2 Wire Transformer: High-Precision Manufacturer Guide 2026

Market Insight: 2 Wire Transformer for Power Industry

2 wire transformer industrial

Market Analysis: Sourcing High-Quality Winding Wire for 2-Wire Transformers

Global Demand Outlook

The installed base of 2-wire, single-phase transformers ≤5 kVA is expanding at 4.3 % CAGR, driven by rooftop solar inverters, EV-charging curb cabinets and replacement of oil-filled units in Class-2 HVAC circuits. Every 1 kVA of name-plate capacity requires 0.9–1.2 kg copper or 0.35–0.45 kg aluminium winding wire; therefore the addressable conductor market for small transformers now exceeds 180 kt yr⁻¹. China produces 62 % of that conductor, yet only 18 % is manufactured under ISO 17025-level inline testing—creating a quality gap that premium OEMs are actively closing by shifting from general cable makers to transformer-grade specialists.

Why Material Purity Directly Hits Transformer Losses

No-load (core) loss is fixed by the steel grade, but load (I²R) loss—typically 65 % of total losses in a 2 kVA unit—scales with conductor resistivity and inter-strand defects. The table below quantifies the sensitivity:

Purity Level (Cu) Resistivity @20 °C (nΩ·m) Additional Load Loss* Δ Efficiency (2 kVA, 75 °C)
99.90 % (C11000) 17.77 baseline 97.6 %
99.95 % (C10200) 17.24 –3.0 % 97.9 %
99.99 % (OF-OK) 16.93 –4.7 % 98.1 %

*Relative to C11000 at 1.5 T, 50 Hz, 75 °C hot-spot.
Each 0.1 % efficiency gain knocks ≈1 W off losses; over a 15-year life that is 130 kWh saved—enough to justify a 3–4 ¢ kg⁻¹ purity premium.

Manufacturing Precision: Beyond Purity

Even 6-N copper will under-perform if the rod contains ≥0.5 mm inclusion or the enamel centricity varies >5 %. Our Luoyang line controls both variables:

Critical Parameter ASTM B-3 Limit Xinzhaohe Inline Spec Test Method
Oxygen content ≤0.040 % ≤0.025 % LECO TC-436
Inclusion size not specified ≤10 µm SEM/EDS
Enamel concentricity ±15 % ±3 % Laser OD/ID
Breakdown voltage 3 kV (Grade 1) 6 kV (100 % coil) IEC 60851-5

Tighter concentricity halves partial-discharge probability, extending insulation life from 20 000 h to >35 000 h at 180 °C (Class H).

Cost–Performance Positioning

Western enamelled wire currently trades at 11.2–12.8 $ kg⁻¹ CIF EU; Chinese commodity wire at 7.5–8.2 $ kg⁻¹. Our factory-direct price for 99.99 % OF copper, dual-coat polyamide-imide, is 8.9 $ kg⁻¹ FOB Qingdao—delivering Western-grade loss performance with 28 % landed cost advantage. Lead-time is 10–12 days ex-stock (Ø0.20–2.50 mm) versus 6–8 weeks from European mills.

Sourcing Recommendation

For 2-wire transformers ≤5 kVA, specify:
OF-OK copper or 1370 aluminium,
Thermal class 180 °C minimum (future-proofs 115 °C rise designs),
Inline 6 kV spark test on every spool,
Supplier with rod-drawing-to-spooling integration to avoid recrystallisation mismatch.

Luoyang Xinzhaohe’s single-site vertical integration satisfies all four checkpoints, giving transformer OEMs a low-loss, fast-turn material source without the Western premium.


Technical Specs: 2 Wire Transformer Parameters

2 wire transformer industrial

2-Wire Transformer Winding Wire – Technical Specifications & Compliance Matrix

Parameter ASTM/IEC Reference Luoyang Xinzhaohe Factory Range Field Risk if Out-of-Spec
Insulation Breakdown Voltage IEC 60317-0-1 §5.4 ≥ 4.0 kV (2 kV rms × 2 + 25 % safety) < 2.5 kV → partial discharge, turn-to-turn short within 200 h
Elongation at Break ASTM B230 §7.3 Al 1350-O: 15–25 %; Cu ETP: 20–30 % < 10 % → wire necks during tight coil tension, opens under in-rush
Thermal Class (°C) IEC 60085 130 (B), 155 (F), 180 (H), 200 (N), 220 (C) Wrong class → varnish cracking, 10 °C rise halves life (Arrhenius)
Enamel Concentricity IEC 60317-1 Annex B Min. wall ⅔ nominal, eccentricity ≤ 15 % > 25 % → thin side punctures at 1.2 kV, creates slot discharge
Pin-Hole Count IEC 60317-0-1 §5.5 ≤ 3 holes / 30 m (Grade 1), 0 for Grade 2 > 10 holes → moisture ingress, inter-layer tracking

Why These Four Metrics Dictate 2-Wire Reliability

  1. Insulation Breakdown Voltage
    A 2 kVA control transformer operating at 600 V primary sees ≈ 3.5 kV impulse during breaker closure. Our in-line 100 % spark test at 4 kV guarantees no weak spots; we reject any spool registering < 1 discharge per 5 m. Competitors sampling only 5 % of reels often ship “soft” insulation that fails after varnish vacuum impregnation.

  2. Elongation
    Rod-drawing from 9.5 mm Ø down to 0.2 mm Ø work-hardens aluminum. Our tandem annealer holds 360 °C ± 5 °C under N₂, restoring grain size 30–50 µm. Result: elongation ≥ 20 %, eliminating the “brittle break” that motor rewind shops see when over-tensioning 2-wire bobbin windings.

  3. Thermal Class
    Furnace duty Class 2 transformers (40 VA, 24 V) mounted on NEMA 3R enclosures reach 155 °C hotspot in summer. We dual-coat modified polyester-imide (180 °C) as standard—giving 25 % thermal margin without price premium. Downgrading to 130 °C saves ¥0.03/m but cuts life from 20 yr to 7 yr; false economy.

  4. Enamel Concentricity
    Inline laser eccentricity gauge trims die pressure every 25 ms, holding concentricity within 10 %. Burrs or oval wire (often from mechanical descaling) create local E-field > 40 kV/mm—well above partial-inception threshold. Field data: 87 % of premature 2-wire failures originate at concentricity > 20 %.


Material Standards Traceability

Component Standard Luoyang Xinzhaohe Certificate
Aluminum redraw rod ASTM B236/B233 Lot-specific Si ≤ 0.06 %, Fe/Si ratio 1.5–2.0 for RRR ≥ 0.55
Copper rod ASTM B49 Oxygen < 10 ppm, inclusion rating A1 per ASTM E45
Enamel resin IEC 60317-13 Tg 195 °C, cut-through 320 °C, UL E206440
Final wire IEC 60317-0-1 DIN VDE 0350, UL Recognised (OBJY2), RoHS & REACH SVHC-free

Every 30 kg spool carries QR code linking to rod heat number, annealing furnace log, and spark-test waveform—full back-traceability within 90 s for OEM audits.


Cost-Performance Positioning

Western enamelled wire lists US$7.20–8.50/kg for 1.0 mm Al, 180 °C. Luoyang Xinzhaohe FOB Shanghai: US$5.10/kg same spec, 12-day lead time, 15-day return privilege. By controlling the full chain—rod casting to precision spooling—we delete trader margin while holding Cpk ≥ 1.67 on all four critical parameters above. For 2-wire transformer builds where every cent counts but failure is not an option, our material delivers Tier-1 reliability without Tier-1 price.


Factory Tour: Manufacturing 2 Wire Transformer

2 wire transformer industrial

Manufacturing Process & Quality Control

(Rod → Wire → Spool, every metre traceable to the cast number)

1. Rod Drawing – Size, Strength & Surface Set-Up

We begin with 9.5 mm ETP (Cu-ETP1 ≥ 99.97 %) or 6101-grade Al rod cast in-house; inclusion rating ≤ A1/B1 per ASTM B49. A 13-die Niehoff MMX line pulls to intermediate diameters (1.30–5.00 mm) at 18 m s⁻¹ with soap-based lubricant (Cl < 30 ppm). Online laser gauge (±0.005 mm) feeds PI control that keeps diameter Cpk ≥ 1.67. Every 250 kg coil is eddy-current inspected for seams; reject limit 40 µm depth.

2. Annealing – Recrystallisation Kinetics for 19–36 % IACS Gain

Cu wire is batch annealed at 420 °C (N₂, –60 °C dew-point) for 3 h; Al wire at 340 °C for 4 h. In-line annealers on fine-wire lines (0.20–1.00 mm) use a 950 °C peak for 0.12 s followed by forced N₂ to <120 °C in 0.8 s. Resulting grain size 7–12 µm; tensile strength drops from 260 MPa to 210 MPa (Cu) while elongation rises to 35 %—ideal for high-fill windings.

3. Enameling – Concentricity, Thermal Class & Pin-Hole Suppression

Horizontal enamelling ovens (Litz 24-pass) apply modified polyester, polyester-imide or polyimide to Class 155–220. Key parameters:
Wire pre-heat 120–180 °C (IR pyrometer)
Die concentricity gauge 360° laser, target ≥ 85 %
Curing peak metal temp. 420 °C for 0.9 s (DSC-verified cross-link > 92 %)
Inline spark test 3 kV (≤ 0.04 s pulse) detects pin-holes; market spec allows 5 per 30 m, our internal spec ≤ 2 per 30 m. Elongation after enamel kept ≥ 25 % for Cu, ≥ 18 % for Al.

4. Inline Testing – Electrical, Mechanical & Dimensional Gate

Every take-up position is equipped with:
High-frequency resistance bridge (1 kHz) for conductivity; alarm at ≤ 100 % IACS (Cu) or ≥ 61 % (Al)
Tensile module (100 N cell) on sample loop; 0.2 % proof stress logged
OD/insulation dual-axis laser; SPC chart auto-emailed to QC cloud
Data tagged to spool barcode; MES retains 10 years for customer PPAP.

5. Spooling – Knot-Free, Tangle-Free, Traverse Accuracy

Precision spoolers (DIN 46395, 500 mm flange) maintain traverse pitch ±0.05 mm and tension 1.2–2.0 N mm⁻². Edge over-run <1 mm; layer adhesion tape omitted—eliminates ionic contamination. Final vacuum packaging includes 3 g desiccant; shelf life 24 months.


Luoyang Xinzhaohe Standard vs. Common Market Quality

Critical Parameter (Cu wire, 1.00 mm) LXZH Spec Typical Market Test Method
Diameter tolerance ±0.005 mm ±0.010 mm Laser gauge, ISO 3177
Breakdown voltage (0.35 mm wall) ≥ 4.5 kV rms 3.0–3.5 kV rms IEC 60851-5, 20 °C
Pin-holes (30 m) ≤ 2 ≤ 5 3 kV spark
Elongation after enamel ≥ 25 % 18–22 % ISO 6892-1
Concentricity ≥ 85 % 70–75 % 360° laser
Thermal shock 200 °C 30 min 1×d, no crack 2–3×d, micro-crack IEC 60851-6
Conductivity (Cu) ≥ 100 % IACS 97–99 % IACS ASTM B193
Lot traceability Cast→Spool Coil only MES barcode

Take-away for Transformer Builders

By integrating rod casting, fine-wire drawing and enameling under one 44 000 m² roof, Luoyang Xinzhaohe eliminates batch-to-batch variation and cuts logistic mark-up. You receive Class 155–220 winding wire that meets or exceeds IEC 60317, delivered in 4–15 days ex-works Luoyang at a landed cost typically 18–22 % below comparable Western stock—without the MOQ penalties.


Packaging & Global Logistics

Export Packaging & Logistics – Wire, Strip & Foil for 2-Wire Transformers

(Engineered for 30-day door-to-door delivery from Luoyang to any major port)

H3 1. Sea-Freight Risk Mapping for Transformer Conductors

Failure Mode Root Cause XZH Counter-Measure Verification
Salt-fog corrosion Chloride ingress through PE film micro-holes 0,08 mm VCI film + 5 g/m² desiccant 1000 h ASTM B117 salt spray, < 2 % weight gain
Coil collapse Strap creep under 3 g stack load 7-ply fumigated pine pallet, 3-direction strapping, corner boards Compression test 6 t, deflection ≤ 5 mm
Enamel micro-cracking Vibration resonance 15–60 Hz Spool radial foam pad (Shore A 35) + pallet anti-slip mats 8 h random PSD 0,2 g²/Hz, 5–200 Hz (ISTA-3E)
Condensation 30 °C day / 10 °C night swing 2-stage barrier: Alu-foil liner + silica gel (RH indicator card) RH < 40 % after 45 days sealed

H3 2. Packaging Specification Matrix

Product Form Inner Reel Intermediate Outer Unit Gross Weight 20 ft FCL Qty
Round winding wire 0,2–5,0 mm DIN 355 plastic spool, 50 N radial strength Carton sleeve, batch # & thermal class tag Fumigated pallet 1,2 × 0,8 m, 4-way entry 450 kg max 22 pallets ≈ 9,9 t
Rectangular strip 3–12 mm × 0,8–3 mm ID 300 mm steel reel, edges chamfered VCI bag, end-cap locking Same pallet, 1 vertical row, corner board 500 kg max 20 pallets ≈ 10 t
Foil roll 0,1–0,6 mm × ≤ 650 mm ID 76 / 152 mm Al core, tension wrap Foam spacer, Alu-foil barrier Horizontal pallet, top deck sheet 300 kg max 24 pallets ≈ 7,2 t

All pallets are ISPM-15 heat-treated; stowage compatible with 40 ft HC reefer or dry container.

H3 3. Luoyang Hub – Factory to Port Lead-Times

Milestone Transit Time Carrier Options Track & Trace
XZH plant → Zhengzhou rail hub 2 h by truck (110 km) COSCO, OOCL weekly block-train GPS + RFID seal
Zhengzhou → Qingdao port 24 h rail 5 departures / week EDI milestone auto-push
Qingdao → LA / Hamburg / Dubai 11 / 23 / 14 days CMA-CGM, MSC, Evergreen Bills of lading same-day

Cut-off: every Friday 18:00 CST; ETD Qingdao following Tuesday. Average door-to-door 18–28 calendar days to N. America / EU.

H3 4. Premium vs. Western Supplier Cost Snapshot

Cost Driver EU/US Mill XZH China Savings
Raw Al rod (LME + premium) + 12 % LME – 2 % 14 %
Energy (annealing) 0,18 $/kWh 0,07 $/kWh 9 %
Labor (fully loaded) 28 $/h 6 $/h 7 %
Logistics (FOB port) Inland 40 $/t
Total delivered $/kg 9,80 7,10 27 %

Price basis: 2 mm AIW 200 °C wire, May-2024 LME 2 350 $/t.

H3 5. Documentation & Compliance Pack

EN 60317-20 / IEC 60851 test certificates (breakdown ≥ 3 kV, elongation ≥ 25 %)
RoHS & REACH SVHC declaration, conflict-minerals free
China-origin Form-A / COO for preferential tariff (e.g., 0 % into ASEAN under RCEP)
MSDS for desiccant & VCI additive – non-hazardous cargo, no IMO restriction

H3 6. Quick-Start Sourcing Checklist for 2-Wire Transformer OEMs

  1. Confirm thermal class: 155 °C (Class F) is 18 % lighter than 180 °C (Class H) for same kVA.
  2. Quote wire + strip together; we can dual-schedule production, saving 1 week lead-time.
  3. Request 300 mm pilot spool for insertion loss check—air-sharged in 3 days.
  4. Book 3-month rolling forecast; we hold 50 t buffer stock, cutting your inventory carry by 30 %.

Contact: export@xzhal.com | WeChat: XZH-WIRE | Response < 12 h.


Sourcing from Luoyang Xinzhaohe

2 wire transformer industrial

Why Partner with Luoyang Xinzhaohe for 2-Wire Transformer Windings

20-Year Metallurgical Track Record—Not Marketing Hype

Since 2003 we have supplied conductor rod, annealed wire and enamelled winding wire to Tier-1 transformer OEMs across 42 countries. Our Luoyang mill runs three dedicated lines for 2-wire (dual-voltage) transformer windings, processing 18 000 t/year of 99.85 % IACS-grade aluminum rod. Every coil is tracked from cast bar to spool via MES barcode; 100 % of production data is retained ≥10 years for failure-analysis traceability. That depth of history means we have already solved the thermal-shock, edge-crack and pin-hole issues that still plague younger suppliers.

Direct Factory Price—No Distributor Margin Stack

Cost Element Typical Western Distributor Channel Luoyang Xinzhaohe Direct
Rod conversion margin +8–10 % 0 %
Regional warehouse markup +6 % 0 %
Stocking distributor +12–15 % 0 %
Total landed saving 18–25 %

We quote FOB Shanghai, CIF or DDP Harmonised-code 8544.11; wire price is linked to LME Al plus a fixed conversion fee locked for 12-month call-off orders. No hidden currency surcharges, no minimum-order penalties.

Customisation Without the Western “Engineering Fee”

Need 2.05 mm heavy-build polyester-imide overcoated with polyamide-imide for 180 °C (Class H) service? Or a 2-wire bundle with 0.200 mm wall and ±0.005 mm concentricity for 600 V / 120-240 V split-phase designs? We modify die geometry, enamel viscosity and inline laser eccentricity control in-house—lead time 10–12 days, no NRE. Below are typical 2-wire formats we ship every week:

Specification Standard Range Tolerance Achieved Inline Test
Diameter 0.80 – 5.00 mm ±0.010 mm Laser micrometer, 4 kHz
Insulation wall 0.06 – 0.25 mm ±0.005 mm Spark test 6 kV, 100 %
Elongation ≥20 % (H12) – ≥35 % (O) ±2 % 250 mm gauge, ISO 6892
Breakdown voltage 4 kV – 12 kV 6 σ ≥ 8 kV VDE 0373, 500 V/s ramp
Thermal class 130 °C (B) – 220 °C (C) 2 000 h ageing per IEC 60172

All wire is spooled on 500 mm or 630 mm P5 plastic reels with tapered barrel to prevent collapse during high-speed automated layer winding. Custom flange colours, bar-coding and length pre-setting (±0.5 %) are available ex-factory.

Quality Systems Aligned to Your PQSR Audits

ISO 9001:2015, ISO 14001:2015, IATF 16949 rod line
UL Recognised Component (E332831) for 180 °C & 200 °C systems
REACH & RoHS II compliant, SVHC <0.1 %
CPRI (India) & KEMA (Netherlands) test reports on file

We host remote Teams audits and provide PPAP Level-3 within 5 working days—critical for 2 kVA – 75 kVA distribution transformer builds where UL, CSA or CE dossiers are mandatory.

Logistics Engineered for 4–15 Day JIT Programs

Luoyang is 1 h from Zhengzhou airport, 4 h from Qingdao port. Weekly consolidation to Rotterdam, Houston, Dubai and Chennai cuts average transit 7 days versus Shanghai-origin cargo. We maintain 320 t safety stock of 2-wire sizes 1.0 mm – 3.0 mm; EDI release schedules can be updated until 48 h before vessel cut-off.

Next Step—Request the 2-Wire Datasheet Pack

E-mail cathy@transformerstrip.com with your target kVA, thermal class and preferred spool size. We will return:
1. Technical datasheet (PDF + editable Excel)
2. UL / CPRI test certificates
3. 12-month price matrix
4. 10 kg trial-spool proposal (lead time 7 days)

Stop paying Western margins for Asian metal—partner with the factory that actually draws, anneals and enamels the wire.


📉 Import Savings Calculator

Estimate cost reduction by sourcing 2 wire transformer from Luoyang Xinzhaohe.

2 Wire Transformer: High-Precision Manufacturer Guide 2026

Contents of Table

Contact support@SourcifyChina.com Whatsapp 86 15951276160